| Home > Publications database > Results from End-of-Substructure card production for the ATLAS ITk Strip upgrade using both the lpGBT-v1 and -v2 ASIC |
| Journal Article/Contribution to a conference proceedings | PUBDB-2026-01209 |
; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ;
2026
Inst. of Physics
London
This record in other databases:
Please use a persistent id in citations: doi:10.1088/1748-0221/21/04/C04015 doi:10.3204/PUBDB-2026-01209
Abstract: The tracking system of the ATLAS experiment will be upgraded for the upcoming High-Luminosity Upgrade of the LHC (HL-LHC). The main building blocks of the new strip tracker aresilicon-strip modules that consist of a sensor and hybrid PCB’s. The modules are mounted on rigidcarbon-fibre substructures, the so-called staves (petals) in the barrel (end-cap) regions, that providecommon services to the modules. At the end of each stave or petal side, a so-called End-of-Substructure(EoS) card facilitates the transfer of data, power, and control signals between the modules and theoff-detector systems. The EoS connects up to 28 data lines, each with 640 Mb/s, from the modules toone or two lpGBT chips that provide data serialization and use a 10 Gb/s versatile optical link (VL+) totransmit signals to the off-detector systems. The lpGBT also recovers the LHC clock on the downlinkand generates clock and control signals for the modules. To meet the tight integration requirements inthe detector, fourteen different EoS card designs are necessary. The power to the EoS is provided by adedicated dual-stage DC-DC package providing 2.5 and 1.26V to the EoS cards. A first productionof almost 2000 EoS cards has been stopped due to the errors found in the lpGBT-v1 ASIC, but allaccompanying DC-DC converters have been produced. We report on the production experienceincluding detailed QC statistics and design validation (QA) results for the EoS itself with the lpGBT-v1ASIC and how the two lpGBT issues were identified and how many EoS boards were affected by each.With the lpGBT-v2 ASIC now in hand, we report first QC results with the second production iteration.
|
The record appears in these collections: |
Poster
Results from End-of-Substructure card production for the ATLAS ITk Strip upgrade using both the lpGBT-v1 and -v2 ASIC
Topical Workshop on Electronics for Particle Physics, TWEPP, RethymnoRethymno, Greece, 6 Oct 2025 - 10 Oct 2025
Files
Fulltext
BibTeX |
EndNote:
XML,
Text |
RIS