| Home > Publications database > Status of the design and simulations for the FOFB of PETRA IV |
| Conference Presentation (Invited) | PUBDB-2025-05024 |
2025
Abstract: PETRA III is one of the most important facilities at DESY. The PETRA IV project aims to replace PETRA III with an ultra-low emittance ring (20 pm), add a new experimental hall in two additional octants and replace DESY II with a new low emittance booster. In this way, the emittance will be reduced from 1300 pm to 20 pm. A brief overview of the activities on the way to a stable beam orbit will be given. The following points will be introduced during the presentation: The stability task force, the system modelling and hardware design, the perturbation and noise models used and the SISO simulation as a first step towards a full ring simulation. Finally, we will conclude the presentation.
|
The record appears in these collections: |