TY  - CONF
AU  - Pfeiffer, Sven
TI  - Status of the design and simulations for the FOFB of PETRA IV
PB  - KIT North Campus
M1  - PUBDB-2025-05024
PY  - 2025
AB  - PETRA III is one of the most important facilities at DESY. The PETRA IV project aims to replace PETRA III with an ultra-low emittance ring (20 pm), add a new experimental hall in two additional octants and replace DESY II with a new low emittance booster. In this way, the emittance will be reduced from 1300 pm to 20 pm. A brief overview of the activities on the way to a stable beam orbit will be given. The following points will be introduced during the presentation: The stability task force, the system modelling and hardware design, the perturbation and noise models used and the SISO simulation as a first step towards a full ring simulation. Finally, we will conclude the presentation.
T2  - I.FAST Workshop 2025 on the Stability of Storage Ring Based Light Sources
CY  - 17 Mar 2025 - 21 Mar 2025, Karlsruhe (Germany)
Y2  - 17 Mar 2025 - 21 Mar 2025
M2  - Karlsruhe, Germany
LB  - PUB:(DE-HGF)6
UR  - https://bib-pubdb1.desy.de/record/641295
ER  -