Home > Publications database > Commissioning experience with two in-vacuum undulators at PETRA III |
Journal Article/Contribution to a conference proceedings | PUBDB-2023-01309 |
; ; ;
2023
IOP Publ.
Bristol
This record in other databases:
Please use a persistent id in citations: doi:10.1088/1742-6596/2380/1/012021 doi:10.3204/PUBDB-2023-01309
Abstract: In 2018 the high energy X-ray beamlines P07 and P21b at DESY's storage ring PETRA III received new undulators. The two identical devices were built by an industry collaboration of Research Instruments GmbH and Kyma S.p.A. according to DESY's specifications. They have a magnetic length of 4 m, a period length of 21.2 mm and a deflection parameter K of 1.41 at a gap of 7.0 mm. We report about experience during magnet tuning, the final acceptance measurements and the commissioning in the accelerator tunnel.
![]() |
The record appears in these collections: |
Book/Proceedings
Synchrotron radiation instrumentation: proceedings, 14th international conference, SRI 2021, Hamburg, Germany, March 28-April 1, 2022
Synchrotron Radiation Instrumentation, SRI 2021, HamburgHamburg, Germany, 28 Mar 2022 - 1 Apr 2022
Bristol : IOP, Journal of Physics: Conference Series 2380, (2022) [10.1088/1742-6596/2380/1/011001]
Files
Fulltext
BibTeX |
EndNote:
XML,
Text |
RIS