Talk (non-conference) PUBDB-2024-07227

http://join2-wiki.gsi.de/foswiki/pub/Main/Artwork/join2_logo100x88.png
The DESY II Test Beam Facility - Present and Future

 ;  ;  ;

2024

12th Beam Telescopes and Test Beams Workshop, BTTB12, DESYEdinburgh, DESY, UK, 15 Apr 2024 - 19 Apr 20242024-04-152024-04-19  GO

Abstract: The DESY II Test Beam Facility is looking back at another successful year.<br>In this contribution, a review is given over the test beam period 2023 and the running period 2024. This includes the current status of the facility as well as recent developments of the infrastructure and improvements for the user community.<br>In addition, studies on the future of the facility are presented against the background of an upgrade of the accelerator complex for the planned Petra IV synchrotron source. Different upgrade plans for test beams at the existing synchrotron or at a completely new synchrotron will be introduced, highlighting their advantages and disadvantages.


Contributing Institute(s):
  1. Technol. zukünft. Teilchenph. Experim. (FTX)
Research Program(s):
  1. 621 - Accelerator Research and Development (POF4-621) (POF4-621)
Experiment(s):
  1. DESY: TestBeamline 21 (DESY II)
  2. DESY: TestBeamline 22 (DESY II)
  3. DESY: TestBeamline 24 (DESY II)

Appears in the scientific report 2024
Click to display QR Code for this record

The record appears in these collections:
Private Collections > >DESY > >FH > >FTX > FTX
Document types > Presentations > Talks (non-conference)
Public records
Publications database

 Record created 2024-12-03, last modified 2024-12-20


Restricted:
Download fulltext PDF Download fulltext PDF (PDFA)
External link:
Download fulltextFulltext
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)