| 001 | 618905 | ||
| 005 | 20241220221614.0 | ||
| 037 | _ | _ | |a PUBDB-2024-07227 |
| 041 | _ | _ | |a English |
| 100 | 1 | _ | |a Diener, Ralf |0 P:(DE-H253)PIP1005706 |b 0 |e Corresponding author |u desy |
| 111 | 2 | _ | |a 12th Beam Telescopes and Test Beams Workshop |g BTTB12 |c Edinburgh |d 2024-04-15 - 2024-04-19 |w UK |
| 245 | _ | _ | |a The DESY II Test Beam Facility - Present and Future |f 2024-04-15 - |
| 260 | _ | _ | |c 2024 |
| 336 | 7 | _ | |a Conference Paper |0 33 |2 EndNote |
| 336 | 7 | _ | |a Other |2 DataCite |
| 336 | 7 | _ | |a INPROCEEDINGS |2 BibTeX |
| 336 | 7 | _ | |a LECTURE_SPEECH |2 ORCID |
| 336 | 7 | _ | |a Talk (non-conference) |b talk |m talk |0 PUB:(DE-HGF)31 |s 1734705312_2248424 |2 PUB:(DE-HGF) |
| 336 | 7 | _ | |a Other |2 DINI |
| 502 | _ | _ | |c DESY |
| 520 | _ | _ | |a The DESY II Test Beam Facility is looking back at another successful year. In this contribution, a review is given over the test beam period 2023 and the running period 2024. This includes the current status of the facility as well as recent developments of the infrastructure and improvements for the user community. In addition, studies on the future of the facility are presented against the background of an upgrade of the accelerator complex for the planned Petra IV synchrotron source. Different upgrade plans for test beams at the existing synchrotron or at a completely new synchrotron will be introduced, highlighting their advantages and disadvantages. |
| 536 | _ | _ | |a 621 - Accelerator Research and Development (POF4-621) |0 G:(DE-HGF)POF4-621 |c POF4-621 |f POF IV |x 0 |
| 693 | _ | _ | |a DESY II |f DESY: TestBeamline 21 |1 EXP:(DE-H253)DESYII-20150101 |0 EXP:(DE-H253)TestBeamline21-20150101 |6 EXP:(DE-H253)TestBeamline21-20150101 |x 0 |
| 693 | _ | _ | |a DESY II |f DESY: TestBeamline 22 |1 EXP:(DE-H253)DESYII-20150101 |0 EXP:(DE-H253)TestBeamline22-20150101 |6 EXP:(DE-H253)TestBeamline22-20150101 |x 1 |
| 693 | _ | _ | |a DESY II |f DESY: TestBeamline 24 |1 EXP:(DE-H253)DESYII-20150101 |0 EXP:(DE-H253)TestBeamline24-20150101 |6 EXP:(DE-H253)TestBeamline24-20150101 |x 2 |
| 700 | 1 | _ | |a Ackermann, Sven |0 P:(DE-H253)PIP1008868 |b 1 |e Corresponding author |u desy |
| 700 | 1 | _ | |a Stanitzki, Marcel |0 P:(DE-H253)PIP1014417 |b 2 |u desy |
| 700 | 1 | _ | |a Meyners, Norbert |0 P:(DE-H253)PIP1001971 |b 3 |u desy |
| 856 | 4 | _ | |u https://indico.cern.ch/event/1323113/contributions/5823648/ |
| 856 | 4 | _ | |u https://bib-pubdb1.desy.de/record/618905/files/DESY_II_Test_Beam_Facility-Present_and_Future.pdf |y Restricted |
| 856 | 4 | _ | |u https://bib-pubdb1.desy.de/record/618905/files/DESY_II_Test_Beam_Facility-Present_and_Future.pdf?subformat=pdfa |x pdfa |y Restricted |
| 909 | C | O | |o oai:bib-pubdb1.desy.de:618905 |p VDB |
| 910 | 1 | _ | |a Deutsches Elektronen-Synchrotron |0 I:(DE-588b)2008985-5 |k DESY |b 0 |6 P:(DE-H253)PIP1005706 |
| 910 | 1 | _ | |a Deutsches Elektronen-Synchrotron |0 I:(DE-588b)2008985-5 |k DESY |b 1 |6 P:(DE-H253)PIP1008868 |
| 910 | 1 | _ | |a Deutsches Elektronen-Synchrotron |0 I:(DE-588b)2008985-5 |k DESY |b 2 |6 P:(DE-H253)PIP1014417 |
| 910 | 1 | _ | |a Deutsches Elektronen-Synchrotron |0 I:(DE-588b)2008985-5 |k DESY |b 3 |6 P:(DE-H253)PIP1001971 |
| 913 | 1 | _ | |a DE-HGF |b Forschungsbereich Materie |l Materie und Technologie |1 G:(DE-HGF)POF4-620 |0 G:(DE-HGF)POF4-621 |3 G:(DE-HGF)POF4 |2 G:(DE-HGF)POF4-600 |4 G:(DE-HGF)POF |v Accelerator Research and Development |x 0 |
| 914 | 1 | _ | |y 2024 |
| 920 | 1 | _ | |0 I:(DE-H253)FTX-20210408 |k FTX |l Technol. zukünft. Teilchenph. Experim. |x 0 |
| 980 | _ | _ | |a talk |
| 980 | _ | _ | |a VDB |
| 980 | _ | _ | |a I:(DE-H253)FTX-20210408 |
| 980 | _ | _ | |a UNRESTRICTED |
| Library | Collection | CLSMajor | CLSMinor | Language | Author |
|---|