Home > Publications database > First Operation of the XFEL Linac with the 2 K Cryogenic System |
Contribution to a conference proceedings | PUBDB-2017-13933 |
; ; ; ;
2017
This record in other databases:
Please use a persistent id in citations: doi:10.3204/PUBDB-2017-13933
Abstract: The RF operation of the about 800 superconducting 1.3 GHz 9-cell cavities of the XFEL linac requires helium II bath cooling at 2 K, corresponding to a vapor pressure of 3100 Pa. After the first cool-down of the XFEL linac to 4 K in December, 27th 2016 the operation of the 2 K cryogenic system was started in January, 2nd 2017. The 2 K cryogenic system consist of a 4-stage set of cold compressors to compress helium vapor at a mass flow of up to 100 g/s from 2400 Pa to about 110 kPa and a full flow bypass with an arrangement of heat exchangers and control valves. This paper describes the XFEL refrigerating plant, especially the 2 K cryogenic system, thetuning of the cold compressor regulation to adapt to the XFEL linac static and dynamicheat loads and experience of about 6 months of operation.
![]() |
The record appears in these collections: |