Report/Internal Report PUBDB-2015-04008

http://join2-wiki.gsi.de/foswiki/pub/Main/Artwork/join2_logo100x88.png
The Bypass Project at DORIS II

 ;  ;

1988

3 pp. ()  GO

Report No.: DESY M-88-04

Abstract: DURI5 II is used for high energy physics and for the production of synchrotron radiation. The lack of suitable straight sections for the installation of wigglers or undulators led to the idea of bypassing the one interaction point that is no longer needed. The bypass provides space for 7 additional insertion devices and allows colliding beam operation too. Therefore the bypass can also be used for parasitic synchrotron radiation experiments during high energy physics runs. A description of the bypass is presented.


Contributing Institute(s):
  1. Bereichsleitung Beschleuniger / Bereich Beschleuniger (M)
Research Program(s):
  1. 899 - ohne Topic (POF3-899) (POF3-899)
Experiment(s):
  1. No specific instrument

Database coverage:
OpenAccess
Click to display QR Code for this record

The record appears in these collections:
Private Collections > >DESY > >M > M
Document types > Reports > Internal Reports
Document types > Reports > Reports
Public records
Publications database
OpenAccess

 Record created 2015-10-07, last modified 2021-11-10


OpenAccess:
Download fulltext PDF
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)