http://join2-wiki.gsi.de/foswiki/pub/Main/Artwork/join2_logo100x88.png
TUP056 Industrialization of European XFEL Preparation Cycle “BCP Flash” at Ettore Zanon Company

 ;  ;  ;  ;  ;  ;  ;  ;  ;

2013

16th International Conference on RF Superconductivity, SRF2013, ParisParis, France, 23 Sep 2013 - 27 Sep 20132013-09-232013-09-27  GO

Abstract: In the Specification for XFEL Cavity preparation two different preparation sequences are presented. Ettore Zanon Company as one of the two companies contracted for XFEL cavity production and preparation has chosen the so called BCP flash cycle. To fulfil the requested work flow, quality of infrastructure and processes, the company set up a complete new infrastructure in refurbished fabrication halls. The layout of the facility, set up of work flow of preparation and test results of resonators processed by Ettore Zanon in their infrastructure will be reported.


Contributing Institute(s):
  1. Supraleitung (MKS3)
  2. Planung (MPL)
  3. Istituto Nazionale di Fisica Nucleare (INFN)
Research Program(s):
  1. Facility (machine) XFEL (POF2-XFEL-20130405) (POF2-XFEL-20130405)
Experiment(s):
  1. Facility (machine) XFEL

Appears in the scientific report 2013
Database coverage:
OpenAccess
Click to display QR Code for this record

The record appears in these collections:
Private Collections > >DESY > >M > >MKS > MKS3
Private Collections > >DESY > >M > MPL
Document types > Presentations > Poster
Private Collections > >INFN > INFN
Public records
Publications database
OpenAccess

 Record created 2014-01-17, last modified 2021-11-10


OpenAccess:
Download fulltext DOCX
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)