Report No.: DESY-M-02-01O
Abstract: For TESLA a lot of equipment will be installed inside the accelerator tunnel which is not accessible during the four week run periods. During the following maintenance day time consuming trouble shooting is not possible and equipment will be exchanged instead of being repaired in place. Therefore the equipment has to be installed in electronic racks inside a container frame. This container will have a docking system to allow a quick exchange of the whole assembly via a monorail that will be installed inside the tunnel. In the TESLA Test Facility this principle will be investigated. The magnet power supplies will be installed in the tunnel. For this purpose the container frames with the electronic racks and a special docking system for quick exchange have been designed, and prototypes are being developed. The power supplies are modified to fit in the electronic racks.
Keyword(s): talk: Paris 2002/06/03 ; electron positron: linear collider ; linear collider: proposed ; buildings ; magnet: power supply ; control system ; DESY TESLA Linac
|
The record appears in these collections: |