| Home > Publications database > Path to AWAKE: Evolution of the concept |
| Report | PUBDB-2016-00233 |
; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ;
2015
This record in other databases:
Report No.: arXiv:1511.09032
Abstract: This report describes the conceptual steps in reaching the design of the AWAKE experiment currently under construction at CERN. We start with an introduction to plasma wakefield acceleration and the motivation for using proton drivers. We then describe the self-modulation instability --- a key to an early realization of the concept. This is then followed by the historical development of the experimental design, where the critical issues that arose and their solutions are described. We conclude with the design of the experiment as it is being realized at CERN and some words on the future outlook. A summary of the AWAKE design and construction status as presented in this conference is given in [1].
|
The record appears in these collections: |
Journal Article
Path to AWAKE: Evolution of the concept
2nd European Advanced Accelerator Concepts Workshop, EAAC2015, La Biodola, Isola d'ElbaLa Biodola, Isola d'Elba, Italy, 13 Sep 2015 - 19 Sep 2015
Nuclear instruments & methods in physics research / A 829, 3 - 16 (2016) [10.1016/j.nima.2015.12.050]
Files
Fulltext
Fulltext by arXiv.org
BibTeX |
EndNote:
XML,
Text |
RIS