% IMPORTANT: The following is UTF-8 encoded.  This means that in the presence
% of non-ASCII characters, it will not work with BibTeX 0.99 or older.
% Instead, you should use an up-to-date BibTeX implementation like “bibtex8” or
% “biber”.

@INPROCEEDINGS{Marchetti:403195,
      author       = {Marchetti, Barbara and Assmann, Ralph and Baark, Stefan and
                      Burkart, Florian and Dorda, Ulrich and Floettmann, Klaus and
                      Hartl, Ingmar and Hauser, Jakob and Herrmann, Joerg and
                      Hüning, Markus and Knebel, Lennart and Krebs, Olaf and
                      Kube, Gero and Kuropka, Willi and Lederer, Sven and Lemery,
                      Francois and Ludwig, Frank and Marx, Daniel and Mayet, Frank
                      and Pelzer, Maike and Peperkorn, Ingo and Poblotzki, Frauke
                      and Pumpe, Sebastian and Rothenburg, Jens and Schlarb,
                      Holger and Titberidze, Mikheil and Vashchenko, Grygorii and
                      Vinatier, Thomas and Walker, Paul Andreas and Winkelmann,
                      Lutz and Wittenburg, Kay and Yamin, Sumera and Zhu, Jun},
      title        = {{S}tatus of the {ARES} {RF} {G}un at {SINBAD}: {F}rom its
                      {C}haracterization and {I}nstallation {T}owards
                      {C}ommissioning},
      reportid     = {PUBDB-2018-01981},
      pages        = {3},
      year         = {2018},
      abstract     = {The SINBAD facility (Short and INnovative Bunches and
                      Accelerators at DESY) is foreseen to host multiple
                      experiments relating to the production of ultra-short
                      electron bunches and novel high gradient acceleration
                      techniques. The SINBAD-ARES linac will be a conventional
                      S-band linear RF accelerator allowing the production of low
                      charge (0.5 pC - tens pC) ultra-short electron bunches (FWHM
                      length ≤ fs - few fs) with 100 MeV energy. The
                      instal-lation of the linac will proceed in stages. In this
                      paper we report on the status of the characterization of the
                      ARES RF gun and the installations of the related
                      infrastructure.},
      month         = {Apr},
      date          = {2018-04-29},
      organization  = {9th International Particle Accelerator
                       Conference, Vancouver (Canada), 29 Apr
                       2018 - 4 May 2018},
      cin          = {MPY1 / MEA / FS-LA / MVS / MIN / MKK / MDI / MSK},
      cid          = {I:(DE-H253)MPY1-20170908 / I:(DE-H253)MEA-20120806 /
                      I:(DE-H253)FS-LA-20130416 / I:(DE-H253)MVS-20120731 /
                      I:(DE-H253)MIN-20120731 / I:(DE-H253)MKK-20120806 /
                      I:(DE-H253)MDI-20120806 / I:(DE-H253)MSK-20120731},
      pnm          = {631 - Accelerator R $\&$ D (POF3-631)},
      pid          = {G:(DE-HGF)POF3-631},
      experiment   = {EXP:(DE-MLZ)NOSPEC-20140101},
      typ          = {PUB:(DE-HGF)8},
      doi          = {10.3204/PUBDB-2018-01981},
      url          = {https://bib-pubdb1.desy.de/record/403195},
}