%0 Conference Paper
%A Marchetti, Barbara
%A Assmann, Ralph
%A Baark, Stefan
%A Burkart, Florian
%A Dorda, Ulrich
%A Floettmann, Klaus
%A Hartl, Ingmar
%A Hauser, Jakob
%A Herrmann, Joerg
%A Hüning, Markus
%A Knebel, Lennart
%A Krebs, Olaf
%A Kube, Gero
%A Kuropka, Willi
%A Lederer, Sven
%A Lemery, Francois
%A Ludwig, Frank
%A Marx, Daniel
%A Mayet, Frank
%A Pelzer, Maike
%A Peperkorn, Ingo
%A Poblotzki, Frauke
%A Pumpe, Sebastian
%A Rothenburg, Jens
%A Schlarb, Holger
%A Titberidze, Mikheil
%A Vashchenko, Grygorii
%A Vinatier, Thomas
%A Walker, Paul Andreas
%A Winkelmann, Lutz
%A Wittenburg, Kay
%A Yamin, Sumera
%A Zhu, Jun
%T Status of the ARES RF Gun at SINBAD: From its Characterization and Installation Towards Commissioning
%M PUBDB-2018-01981
%P 3
%D 2018
%X The SINBAD facility (Short and INnovative Bunches and Accelerators at DESY) is foreseen to host multiple experiments relating to the production of ultra-short electron bunches and novel high gradient acceleration techniques. The SINBAD-ARES linac will be a conventional S-band linear RF accelerator allowing the production of low charge (0.5 pC - tens pC) ultra-short electron bunches (FWHM length ≤ fs - few fs) with 100 MeV energy. The instal-lation of the linac will proceed in stages. In this paper we report on the status of the characterization of the ARES RF gun and the installations of the related infrastructure.
%B 9th International Particle Accelerator Conference
%C 29 Apr 2018 - 4 May 2018, Vancouver (Canada)
Y2 29 Apr 2018 - 4 May 2018
M2 Vancouver, Canada
%F PUB:(DE-HGF)8
%9 Contribution to a conference proceedings
%R 10.3204/PUBDB-2018-01981
%U https://bib-pubdb1.desy.de/record/403195