TY - CONF AU - Montag, C. AU - Klute, J. TI - Unbunched Beam Cleaning in HERA-P IS - DESY-M-00-04ZJ CY - Hamburg PB - DESY M1 - PUBDB-2016-02954 M1 - DESY-M-00-04ZJ SP - 1534-1536 PY - 2000 AB - During luminosity operation of the HERA e-p collider, protons can be stored for more than 24 hours. Unpleasant proton backgrounds develop during long fills which have been traced to beam coasting outside the RF bucket. This causes a large problem for the data acquisition of the internalwire target experiment HERA-B.We will discuss the origin of coasting beam and various cures. The most successful method is to excite coasting beam particles near the vertical betatron tune using a broadband kicker which fires in the dump gap of the proton bunch train. T2 - The 7th European Particle Accelerator Conference EPAC 2000 CY - 26 Jun 2000 - 30 Jun 2000, Vienna (Austria) Y2 - 26 Jun 2000 - 30 Jun 2000 M2 - Vienna, Austria KW - talk: Vienna 2000/06/26 (INSPIRE) KW - electron p: storage ring (INSPIRE) KW - p synchrotron (INSPIRE) KW - beam: background (INSPIRE) KW - beam: absorption (INSPIRE) KW - bending magnet: pulsed (INSPIRE) KW - beam loss (INSPIRE) KW - target: internal (INSPIRE) KW - target: wire (INSPIRE) KW - HERA-B (INSPIRE) KW - DESY HERA Stor (INSPIRE) LB - PUB:(DE-HGF)29 ; PUB:(DE-HGF)8 DO - DOI:10.3204/PUBDB-2016-02954 UR - https://bib-pubdb1.desy.de/record/301895 ER -