MKS

Latest additions:
2018-12-10
11:55
[PUBDB-2018-05326] Book/Report/Internal Report
et al
Cryogenic performance of the first vertical dewar of the TESLA test facility
[TESLA Report 1994-25]
TESLA Reports 10 pp. ()
Restricted: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-12-10
09:10
[PUBDB-2018-05307] Book/Report/Internal Report
et al
A 1.8 K test facility for superconducting RF cavities
[TESLA Report 1994-08]
TESLA Reports 8 pp. ()
Restricted: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-11-12
11:16
[PUBDB-2018-04387] Book/Report/Internal Report

Proposal for the cryogenic supply of a single TTF/FEL-cryomodule test benchttf
[TESLA Report 2001-09]
TESLA Reports 16 pp. ()
A test bench for the test of single TTF/FEL-cryomodules is proposed. The general equipment and the layout of the cryogenic supply are described..
Restricted: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-11-12
11:13
[PUBDB-2018-04385] Book/Report/Internal Report

A proposal for a TESLA accelerator module test facility
[TESLA Report 2001-08]
TESLA Reports 17 pp. ()
Restricted: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-11-02
07:28
OpenAccess [PUBDB-2018-04113] Book/Report/Internal Report

A proposal for the cryogenic supply of a VUV free electron laser at the TESLA test facility at DESY
[TESLA-FEL 1996-06]
TESLA-FEL Reports 26 pp. () [10.3204/PUBDB-2018-04113]  GO
OpenAccess: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-08-31
09:58
[PUBDB-2018-03296] Report
et al
Proposed continuous wave energy recovery operation of an XFEL
[TESLA-FEL 2004-03 ]
11 pp. ()
Commissioning of two large coherent light facilities at SLAC and DESY should begin in 2008 and in 2011 respectively. In this paper we look further into the future, hoping to answer, in a very preliminary way, two questions [...]
Restricted: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2018-01-11
13:36
OpenAccess [PUBDB-2018-00489] Journal Article
et al
Validation of the superconducting 3.9 GHz cavity package for the European X-ray Free Electron Laser
A full test of the cavity package concept under realistic operating condition was a necessary step before the assembly of the European XFEL (EXFEL) 3.9 GHz superconducting system and its installation in the accelerator. One cavity, equipped with magnetic shielding, power coupler and frequency tuner has been tested in a specially designed single cavity cryostat in one of the test benches of the DESY Accelerator Module Test Facility (AMTF). [...]
OpenAccess: Download fulltextPDF Download fulltextPDF (PDFA);
ddc:530
Detailed record - Similar records
2017-12-21
10:32
OpenAccess [PUBDB-2017-13933] Contribution to a conference proceedings
et al
First Operation of the XFEL Linac with the 2 K Cryogenic System
2017 Cryogenic Engineering Conference and International Cryogenic Materials Conference, CEC/ICMC 2017, MadisonMadison, USA, 9 Jul 2017 - 13 Jul 20172017-07-092017-07-13 8 pp. () [10.3204/PUBDB-2017-13933]  GO
The RF operation of the about 800 superconducting 1.3 GHz 9-cell cavities of the XFEL linac requires helium II bath cooling at 2 K, corresponding to a vapor pressure of 3100 Pa. After the first cool-down of the XFEL linac to 4 K in December, 27th 2016 the operation of the 2 K cryogenic system was started in January, 2nd 2017. [...]
OpenAccess: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2017-11-17
11:58
OpenAccess [PUBDB-2017-12091] Contribution to a conference proceedings
et al
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements
2017 Cryogenic Engineering Conference and International Cryogenic Materials Conference, MadisonMadison, USA, 9 Jul 2017 - 13 Jul 20172017-07-092017-07-13 7 pp. () [10.3204/PUBDB-2017-12091]  GO
The European X-ray Free Electron Laser (XFEL) is in operation at DESY. The superconducting XFEL linac will produce pulsed electron beam at an energy of 17.5 GeV [...]
OpenAccess: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records
2017-11-16
16:35
OpenAccess [PUBDB-2017-12069] Contribution to a conference proceedings
et al
Commissioning and First Cooldown of XFEL Linac
2017 Cryogenic Engineering Conference and International Cryogenic Materials Conference, CEC/ICMC 2017, MadisonMadison, USA, 9 Jul 2017 - 13 Jul 20172017-07-092017-07-13 8 pp. () [10.3204/PUBDB-2017-12069]  GO
Beam commissioning of the European X-ray Free Electron Laser (European XFEL project) is ongoing. Commissioning the XFEL cryogenic system has started by cooling down the XFEL injector section in December 2015. [...]
OpenAccess: Download fulltextPDF Download fulltextPDF (PDFA);

Detailed record - Similar records