OpenAccess [PUBDB-2017-01882] Journal Article
; ; ; et al
Performance in the vertical test of the 832 nine-cell 1.3 GHz cavities for the European X-ray Free Electron Laser
ddc:530
The successful production and associated vertical testing of over 800 superconducting 1.3 GHz accelerating cavities for the European X-ray Free Electron Laser (XFEL) represents the culmination of over 20 years of superconducting radio-frequency R&D. The cavity production took place at two industrial vendors under the shared responsibility of INFN Milano–LASA and DESY. [...]
OpenAccess: Download fulltextPDF; External link: Download fulltextFulltext

Detailed record - Similar records
2014-01-17
15:02
OpenAccess [DESY-2014-00910] Poster
; ; ; et al
TUP056 Industrialization of European XFEL Preparation Cycle “BCP Flash” at Ettore Zanon Company
16th International Conference on RF Superconductivity, SRF2013, Meeting locationParis, France, 23 Sep 2013 - 27 Sep 20132013-09-232013-09-27
In the Specification for XFEL Cavity preparation two different preparation sequences are presented. Ettore Zanon Company as one of the two companies contracted for XFEL cavity production and preparation has chosen the so called BCP flash cycle. [...]
Fulltext: Download fulltextDOCX; OpenAccess: Download fulltextDOCX;

Detailed record - Similar records
2014-01-17
14:03
OpenAccess [DESY-2014-00872] Poster
; ; ; et al
Electropolishing for XFEL Cavities Production at Ettore Zanon SpA
16th International Conference on RF Superconductivity, SRF2013, Meeting locationParis, France, 23 Sep 2013 - 27 Sep 20132013-09-232013-09-27
A new horizontal electropolishing facility has been developed by Ettore Zanon SpA (EZ) and implemented for the series production of the EXFEL cavities at EZ. Main electropolishing done according to EXFEL specification is the first step in the surface treatment process, that is essential to reach high performances.Particular attention has been dedicated to find the best configuration during qualification of the system. [...]
Fulltext: Download fulltextDOCX; OpenAccess: Download fulltextDOCX;

Detailed record - Similar records
2014-01-17
14:00
OpenAccess [DESY-2014-00868] Poster
; ; ; et al
Industrialization of European XFEL Preparation Cycle “Final EP” at Research Instruments Company
16th International Conference on RF Superconductivity, SRF2013, Meeting locationParis, France, 23 Sep 2013 - 27 Sep 20132013-09-232013-09-27
In the “Specification for XFEL cavity Preparation two different preparation sequences are presented and left for the choice of processing sequence to the companies. Research Instrument Company (RI) as one of the two companies contracted for XFEL cavity production and preparation has chosen the so called “final EP” cycle. [...]
Fulltext: Download fulltextDOCX; OpenAccess: Download fulltextDOCX;

Detailed record - Similar records
2014-01-14
09:00
[DESY-2014-00379] Talk (non-conference) (Invited)
; ; ; et al
The Challenge and Realization of the Cavity Production and Treatment in Industry for the European XFEL
The main effort in production of 1.3 GHz cavities for the EXFEL was dedicated to transfer the superconducting technology to the industry. These know how transfer is executed by DESY and INFN/LASA team. [...]

Detailed record - Similar records